Technical Overview
  • HOME
  • >
  • Business
  • >
  • Technical Overview
▶ Technical Overview
Expect to generate profits (generate power and secure certified emission reductions, etc)
Classification Main content Investment Profits (operate for 360 days)
1year 5years 10years
Our technology Always operating at flow rates below 70% 500m KRW / 100kW capacity 155,520,000KRW 777,600,000KRW 1,555,200,000KRW
300m KRW / 50kW capacity 77,760,000KRW 388,800,000KRW 777,600,000KRW
Existing technology Stop operating at flow rates below 70% 500m KRW/ 100kW capacity 85,000,000KRW 425,000,000KRW 850,000,000KRWw
Solar power generation Lack of operation time (3.6 time/ 1day ) 200m KRW / 100kW capacity 45,000,000KRW 225,000,000KRW 455,000,000KRW
■ Level of existing technology : Operational rate and efficiency are insufficient as a large capacity
water dam generation system
■ Our operating performance (small hydro power generator)
- 2013 : completed 50kW in Posco factory line
- Installed 1 set (invested 300m KRW) Investment verified by the BS project, considering extended application
- 2013 : self-use after power production by using the water treatment, water return line in posco factory
- Manufacture, installation (2 sets, 80KW) using effluence from the flatfish farm in Wando county
▶ Comparison by Generator Type