▶ Technical Overview
				Expect to generate profits (generate power and secure certified emission reductions, etc)
				
				
				
				
					
						
							| Classification | Main content | Investment | Profits (operate for 360 days) | 
						
						
							| 1year | 5years | 10years | 
						
						
							| Our technology | Always operating at flow rates below 70% | 500m KRW / 100kW capacity | 155,520,000KRW | 777,600,000KRW | 1,555,200,000KRW | 
						
						
							| 300m KRW / 50kW capacity | 77,760,000KRW | 388,800,000KRW | 777,600,000KRW | 
						
						
							| Existing  technology | Stop operating at flow rates below 70% | 500m KRW/ 100kW capacity | 85,000,000KRW | 425,000,000KRW | 850,000,000KRWw | 
						
						
							| Solar power generation | Lack of operation time (3.6 time/ 1day ) | 200m KRW / 100kW capacity | 45,000,000KRW | 225,000,000KRW | 455,000,000KRW | 
						
					
										
				
				 
				
				
				
				
					■ Level of existing technology : Operational rate and efficiency are insufficient as a large capacity
										water dam generation system
					■ Our operating performance (small hydro power generator)
					- 2013 :  completed 50kW in Posco factory line
					- Installed 1 set (invested 300m KRW) Investment verified by the BS project, considering extended application
					- 2013 : self-use after power production by using the water treatment, water return line in posco factory
					- Manufacture, installation (2 sets, 80KW) using effluence from the flatfish farm in Wando county 
				 
				
				
				
					
					▶ Comparison by Generator Type
					
					